In English

Protection coordination study in bhutan transmission network

Thinley Gyeltshen
Göteborg : Chalmers tekniska högskola, 2010. 99 s.
[Examensarbete på avancerad nivå]

Since the effects of an unreliable power system transmission can be widespread and affect millions of people, as well as damage to life and equipment, therefore one of the most important requirements of protection system is to isolate and disconnect faulted parts of the system selectively and quickly. This purpose can be achieved by proper coordination of protective devices. One of the aims of this thesis was to make a general guideline from which proper coordination of transmission system protection can be developed in Bhutan network. This thesis proposes a review of coordination of distance relays for transmission lines of a real network in Bhutan for study. The transmission network in Bhutan has under gone drastic change for past decade, due to growth of generation capacity with the target to generate 10,000M

Oracle XML Developers Kit 10.2.0.2.0 - Production

XML-25011: Error processing XSLT stylesheet: ../index.xsl
file:////usr/local/tomcat/webapps/chex/local/xsl/output/html/normal/body.xsl<Line 340, Column 84>: XML-22021: (Error) Error parsing external document: 'Förbindelse vägras'.